Subaru Forester

1997-2005 of release

Repair and operation of the car



Subaru Forester
+ Subaru Forester cars
+ Maintenance instruction
+ Routine maintenance
- Engine
   Design features and the principle of functioning of the engine, - the general information and adjustment of valvate gaps
   Capital repairs and service of the engine - the general information
   Check of pressure of oil
   Check of compression pressure in cylinders
   Diagnostics of a condition of the engine with use of the vacuum gage
   Removal of the power unit from the car - preparation and precautionary measures
   Removal and installation of the engine
   Alternative versions of schemes of recovery repair of the engine
   Order of dismantling of the engine by preparation it to capital repairs
   Dismantling of the GRM drive, - removal, check of a state and installation of components
   Removal, dismantling, check, assembly and installation of an axis of yokes, - SOHC engines
   Removal, check of a state and installation of camshafts
   Service of heads of cylinders
   Service of the block of cylinders
   The lubrication system - the general information
   Removal, service and installation
   Removal, check and installation of the oil cooler - only DOHC engines
   Trial start and running in of the engine after capital repairs
+ Cooling systems, heating
+ Power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Gear shifting box
+ Coupling, transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal, check and installation of the oil cooler - only DOHC engines

Removal

Details of installation of the oil cooler

Details of installation of the oil cooler

1  —  the Oil cooler
2  —  the Branch pipe of a cooling path
3  —  the Connecting tube
4  —  the Oil filter

 


Details of installation of the oil cooler (continuation)

1  —  the Branch pipe of a cooling path
2  —  the Oil cooler
3  —  the Oil filter
4  —  the Water pump

 


 PERFORMANCE ORDER

1. Remove a reception pipe of system of production of the fulfilled gases.
2. Remove a giving branch pipe to the oil cooler of cooling liquid.
3. Remove an oil filter.
4. Pick up the connecting phone.


Check

 PERFORMANCE ORDER

1. Blow compressed air of a maslotoka.
2. Check the interfaced surface of the block of cylinders, estimate a flute condition under installation of a sealing ring. Make sure of lack of defects of an oil filter.


Installation

 PERFORMANCE ORDER

1. Install the oil cooler and a connecting tube, - the sealing ring is subject to replacement without fail.
2. Connect a branch pipe of a cooling path and a reception pipe of system of production of the fulfilled gases.