|
|
Subaru Forester1997-2005 of releaseRepair and operation of the car |
|
|
Subaru Forester + Subaru Forester cars + Maintenance instruction + Routine maintenance - Engine Design features and the principle of functioning of the engine, - the general information and adjustment of valvate gaps Capital repairs and service of the engine - the general information Check of pressure of oil Check of compression pressure in cylinders Diagnostics of a condition of the engine with use of the vacuum gage Removal of the power unit from the car - preparation and precautionary measures Removal and installation of the engine Alternative versions of schemes of recovery repair of the engine Order of dismantling of the engine by preparation it to capital repairs Dismantling of the GRM drive, - removal, check of a state and installation of components Removal, dismantling, check, assembly and installation of an axis of yokes, - SOHC engines Removal, check of a state and installation of camshafts Service of heads of cylinders Service of the block of cylinders The lubrication system - the general information Removal, service and installation Removal, check and installation of the oil cooler - only DOHC engines Trial start and running in of the engine after capital repairs + Cooling systems, heating + Power supply system and release + Engine electric equipment + Control systems of the engine + Gear shifting box + Coupling, transmission line + Brake system + Suspension bracket and steering + Body + Onboard electric equipment |
Order of dismantling of the engine by preparation it to capital repairs It is the simplest to carry out dismantling of the engine, having installed it on the portable assembly stand. Such adaptation can always be borrowed rather cheap in a workshop of car service. Before fixing the engine at the stand, it is necessary to remove from it a flywheel / a driving disk and a back epiploon.If an opportunity to use the stand is absent, dismantling should be made, having placed the engine on a strong workbench, or having reliably arranged it on a firm floor of a garage. During the work without stand you watch that the engine incidentally did not overturn. If it is planned to make replacement of the engine by restored, remove with old all hinged units and external components and transfer them to the replaceable block. In number such, subject to shift, components enter:
When carrying out complete capital repairs of the old unit, make its dismantling and take all internal components. The optimum order of removal of components at implementation of the procedure of dismantling of the engine is given below:
|
|